1. Tantalum production investigation
2. Excess Hydro power convert to Hydrogen onsite under investigation (Not doubt to power machinery)
3. Chemical Production on site using hydro?
4. Processing of 900k/t of Spod Middlings to Concentrate
5. Tin Cleaning Plant
6. Stage 2: Train No. 2 for prod of PLS + 20Kt/Annum to 40/Kt
7. Stage 3: Full Hydroxide production onsite ... is the most logical path and most profitable ultimately ....that we all suspected but now looks to be seriously considered/implemented as conceptual design underway by Canadians
.
8. Possible European hydroxide plant production
9. Reserve capacity at hydro plant for backup purposes
This is getting serious now ...
Good to see mgmt mapping out the future direction of company here... which is clearly upstream production onsite ... that where the mega bucks will be IMHO
Well Done MGMT!!