AVZ 0.00% 78.0¢ avz minerals limited

AND here 'tis GLAH Mal I hope it copied correct..AVZ Successful...

  1. 2,087 Posts.
    lightbulb Created with Sketch. 106
    AND here 'tis GLAH Mal smile.png I hope it copied correct..

    AVZ Successful in ICSID Interim Measures
    AVZ Minerals Limited (ASX: AVZ, OTC: AZZVF) (Company) provides the following
    update to its shareholders.
    The Company, by its subsidiaries AVZ International Pty Ltd (AVZI) and Green Lithium
    Holdings Pty Ltd (GLH) together with Dathcom Mining SA (Dathcom) previously
    commenced international arbitration proceedings against the Democratic Republic
    of Congo (DRC) pursuant to its Mining Code and the Convention on the Settlement
    of Investment Disputes between States and the Nationals of Other State (ICSID
    Convention) before the International Centre for Settlement of Investment Disputes
    (ICSID) in Washington (refer to ASX announcement dated 9 June 2023 ‘Confirmation
    of Registration of the Request for ICSID Arbitration Proceedings against the
    Democratic Republic of Congo’).
    On 11 December 2023, the ICSID tribunal heard AVZI, GLH and Dathcom’s request
    for provisional measures including an urgent order to preserve the status quo and
    an order to confirm or restore ownership of PR 13359 to Dathcom (refer to ASX
    announcement dated 15 November 2023 ‘ICSID Proceedings Update’).
    The Company is pleased to report that, on 16 January 2024, the ICSID tribunal made
    interim orders to the effect that the DRC take necessary steps to reflect that
    Dathcom is the holder of PR 13359 and to protect AVZI, GLH and Dathcom’s rights
    during the pendency of the proceedings (Interim Orders).
    The ICSID tribunal’s decision to grant provisional measures is an interim decision. It
    does not involve any final conclusion as to the merits of the case, which remain to
    be determined in the substantive proceedings.
    Note: Reference to PR means Permit d’Research or Exploration Licence and PE means Permit
    d’Exploitation or Mining Licence
    Interim Orders
    The Interim Orders are as follows, the DRC shall:
    • re-establish Dathcom as holder of PR 13359, currently being converted into an
    operating permit, on the perimeter mentioned in article 2 of ministerial order
    no. 0921/CAB.MIN/MINES/01/2016 of December 28, 2016, but excluding the
    perimeter covered by PR 15775;
    • instruct Cadastre minier de la RDC (CAMI) to rectify the mining fallout map to
    reflect Dathcom's ownership of PR 13359 on a perimeter excluding the
    perimeter covered by PR 15775, specifying that this permit is in the process of
    being transformed into an operating permit and remains valid;


    ASX Code: AVZ
    OTC Code: AZZVF
    2 | P a g e
    • take the necessary measures to guarantee the integrity of Dathcom's installations and equipment
    within the perimeter of PR 13359 as mentioned in article 2 of ministerial order no.
    0921/CAB.MIN/MINES/01/2016 of 28 December 2016, but excluding the perimeter covered by PR
    15775, as well as the drill cores stored there, until Dathcom takes possession of these installations,
    equipment and drill cores;
    • preserve the confidentiality of all technical, geological and mining information provided by
    Dathcom to the Ministry of Mines, La Congolaise d’Exploitation Minière (Cominière) and CAMI in
    the context of its activities under PR 13359, over the entire perimeter of PR 13359 as referred to
    in Article 2 of Ministerial Order no. 0921/CAB.MIN/MINES/01/2016 of 28 December 2016
    (including the perimeter covered by PR 15775), by taking any useful action to this end;
    • allow the Claimants, within 19 days, to draw up a contradictory inventory of the file kept by CAMI
    relating to PR 13359 on the entire perimeter of PR 13359, as mentioned in article 2 of ministerial
    order no. 0921/CAB.MIN/MINES/01/2016 of 28 December 2016 (including the perimeter now
    covered by PR 15775), up to the date on which the request for PR 15775 was made, and to take a
    copy of this file;
    • refrain from taking, either through its officials, organs, emanations or companies (including
    Cominière, without prejudice to the nature of the links between the DRC and Cominière), any new
    act likely to call into question PR 13359 or which could lead to an aggravation of the present
    dispute or deprive the upcoming final award of its effect; and
    • not to exclude Dathcom's access to the Mpiana Mwanga power plant.
    The Interim Orders are binding on all parties and take effect immediately but may be revised (or
    revoked) by the ICSID tribunal in light of any comments provided by AVZI, GLH and Dathcom and the
    State. The mandatory nature of the Interim Orders was reconfirmed and highlighted by the ICSID
    tribunal in its decision.
    Among other directions, the ICSID tribunal has asked that Dathcom expressly confirm that should the
    DRC comply with these interim orders, AVZI, GLH and Dathcom will request the release of the PE and
    if the DRC releases it, they will progress the development of the project immediately. The Company
    will take the necessary steps to procure that AVZI, GLH and Dathcom provide that confirmation.
    Whilst the Interim Orders require the State to take the necessary steps to record Dathcom as the
    holder of PR 13359, the Interim Orders do not operate to unwind Cominiere’s relinquishment of the
    northern portion of PR 13359 in October 2023 or the immediately subsequent grant of PR 15775 to
    Manono Lithium SA. The ICSID tribunal declined to deal with title to the northern area on an interim
    basis because doing so could affectthe interests of a third party to the proceedings(ie Manono Lithium
    SA), which will be dealt with on a final basis as part of the broader ICSID proceedings.
    The Company considers the unlawfulness of the transfer of PR 13359 from Dathcom to Cominiere,
    which has been reversed under the Interim Orders, renders Cominiere’s relinquishment of the
    northern portion of PR 13359 and the subsequent grant of PR 15775 to Manono Lithium SA to be
    equally unlawful. Accordingly, the Company will continue with its efforts to confirm its and Dathcom’s
    ownership of the northern area of the Manono Project either through its continued negotiations with
    the DRC government’s senior public officials or the prosecution of the ICSID and ICC proceedings to
    their conclusion. However the Company’s board of directors considers this decision provides
    significant further impetus for a negotiated outcome.
    3 | P a g e
    This announcement was authorised for release by the Board of Directors of AVZ Minerals Limited.
    For further information, visit www.avzminerals.com.au or contact:
    Mr. Jan de Jager or Mr. Ben Cohen Media Enquiries:
    Joint Company Secretary Mr. Peter Harris
    AVZ Minerals Limited Peter Harris & Associates
    Phone: +61 8 6186 7600 Phone: +61 (0) 412 124 833
    Email: [email protected]
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.