No worries, in my first post to this thread there is an embedded post. In that post I detail why even a 40,000 metre drill program would not establish a JORC showing a measured and indicated resource for the whole deposit. I think what they are doing is going to establish a measured and indicated resource around holes 1 and 2 and 7 personally, and then through pre feasibility studies see how much of that resource then moves to the proven and probable reserve category. All IMO
AVZ Price at posting:
26.5¢ Sentiment: None Disclosure: Held