If each road trains worth of 74t whether via the Alice, or Esperance or wherever were to cost $4000/trip, and the cargo was 30% Copper conc or 13% Ni, both = 30% Cu in value or around $170k.
Overall transport = 2.3% of final value (refined), so not a huge overall cost, plus everything needed on site would be back loaded.