Chilo,
Hole 10 drilled down plunge!!
We call this a director's special in the industry and the failure to highlight the true width nature of the intersection borders on contempt of the JORC code and ASX listing rules. I will refer the matter to ASIC to investigate.
- Forums
- ASX - By Stock
- Ann: Bakers Find Drill Results
Chilo,Hole 10 drilled down plunge!!We call this a director's...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)