Ravi, I was referring to Oz-Alpha-1,(EP104=NON BKP), spudded on the 1st.April and finished drilling on the 28th. April..Update was provided to those interested on the 28th. of April.
The second well, Oz-Beta-1, was spudded on the 7th.May,(twenty-one days ago), and, as far as is known, is still drilling ahead!
Oz-Beta-1,though it has spudded on EP127(PFC/BKP),will probably terminate on EP104,(PFC/Statoil).
Statoil usually do not release progress reports until the Well has reached basement..
Though this thread "started with Oz-Beta-1,in EP127",It should be realized that as it is still being drilled,
a mere 21 days after spud,and it is highly unlikely any news re this well, will be released to the market until drilling terminates...
- Forums
- ASX - By Stock
- Ann: Baraka and Partners Spud Well on EP127
Ravi, I was referring to Oz-Alpha-1,(EP104=NON BKP), spudded on...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CND (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.002(7.14%) |
Mkt cap ! $17.34M |
Open | High | Low | Value | Volume |
2.7¢ | 3.0¢ | 2.7¢ | $41.17K | 1.412M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 384482 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 102217 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 384482 | 0.029 |
2 | 1015094 | 0.028 |
3 | 768607 | 0.027 |
1 | 1000000 | 0.026 |
3 | 2435000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 102217 | 2 |
0.032 | 233250 | 2 |
0.033 | 196820 | 1 |
0.034 | 400000 | 1 |
0.036 | 50000 | 1 |
Last trade - 15.50pm 26/07/2024 (20 minute delay) ? |
Featured News
CND (ASX) Chart |