This is imp. tendering starts excellent:
Work on the upstream portion of the revised BAM Study is nearing completion, with all engineering
deliverables completed on the Mine and Concentrator. Remaining works are focused on finalising
technical documentation to enable detailed design, early procurement and completion of the
proposed construction schedule.
Following the approval of the Program for Environment Protection and Rehabilitation7
, the BAM Study
construction schedule will reflect an accelerated commencement of operation of the upstream Mine
and Concentrator operation.
In preparation for this accelerated upstream development schedule, Renascor is commencing
procurement of long-lead time items and tendering for front-end engineering design of the Mine and
Concentrator
- Forums
- ASX - By Stock
- Ann: Battery Anode Material Study Update
This is imp. tendering starts excellent:Work on the upstream...
Featured News
Add RNU (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.2¢ |
Change
0.001(1.41%) |
Mkt cap ! $183.0M |
Open | High | Low | Value | Volume |
7.1¢ | 7.4¢ | 7.1¢ | $189.6K | 2.599M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 260232 | 7.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 63824 | 0.074 |
3 | 55927 | 0.073 |
5 | 260580 | 0.072 |
10 | 1504050 | 0.071 |
33 | 2493747 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 120099 | 5 |
0.071 | 25892 | 1 |
0.073 | 100000 | 1 |
0.074 | 210000 | 1 |
0.075 | 205348 | 3 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
RNU (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online