lists 1-2 additional BESS by 2025 to reach stated storage target of 2500mwh... one of them likely to be Townsville
BBP capacity to be 2 hours @ 50mw/100mwh - has been reported in multiple locations that the initial application stated capacity of up to 100mw/200mwh
Likely that the other two sites would be of the 50mw/150mwh size or hopefully a bit larger output and storage... obviously dependent on line capacity - but IMO 100mw/300mwh would be very appealing. Would be good to establish in QLD rapidly... also interesting that they have ignored Snowy & Shoalhaven from NSW BESS storage numbers.... makes for a very different level of installed capacity in NSW
- Forums
- ASX - By Stock
- GNX
- Ann: Battery Energy Storage System Presentation
Ann: Battery Energy Storage System Presentation, page-3
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $373.9M |
Open | High | Low | Value | Volume |
27.0¢ | 27.3¢ | 27.0¢ | $402.6K | 1.491M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 17623048 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 8160361 | 65 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 17623048 | 0.270 |
19 | 9504312 | 0.265 |
2 | 6600 | 0.260 |
2 | 41970 | 0.255 |
1 | 10000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 7672361 | 61 |
0.280 | 2002907 | 13 |
0.285 | 1100 | 1 |
0.290 | 158219 | 5 |
0.295 | 124962 | 2 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
GNX (ASX) Chart |