EMN are trying but they arent close:
1: They have an after-tax NPV of US$593 million using a 10% discount rate, and an after-tax IRR of 22.6% and thats their whole business. We are ahead of the curve even without the HPM
2: $459.2 million in CAPEX for their project with a 4.5 year pay back. We are cash flow positive, ready to produce in 2024/25 and will likely be self funding and lower CAPEX from exsisting infrastucture
3: A positive for EMN is a very low OPEX per tonne of plant feed at at $111.28/T with HPEMM going at $4617 per tonne and HPMSM at $2666 per tonnes thats a nice margin.
E25 have a few more steps in that process operating at $150A$/dt Product so I assume higher OPEX however even at a high OPEX lets just pick a silly number like $500 per tonne you are still making $2000 per tonne on HPMSM and $4100 on HPEMM depending on what E25 are capbale of. Huge margins there if we can pull it off
- Forums
- ASX - By Stock
- E25
- Ann: Battery Grade HPMSM Processing Breakthrough
Ann: Battery Grade HPMSM Processing Breakthrough, page-54
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add E25 (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $45.08M |
Open | High | Low | Value | Volume |
21.0¢ | 21.0¢ | 20.5¢ | $3.847K | 18.65K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 47676 | 20.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 152276 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 47176 | 0.205 |
9 | 426896 | 0.200 |
1 | 50000 | 0.195 |
4 | 22828 | 0.190 |
1 | 2709 | 0.185 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 52276 | 2 |
0.225 | 25000 | 1 |
0.230 | 28999 | 1 |
0.235 | 3126 | 2 |
0.240 | 28898 | 3 |
Last trade - 14.18pm 05/07/2024 (20 minute delay) ? |
Featured News
E25 (ASX) Chart |