is this what they are trying to solve?
"Field gas boosting is the process of boosting low-pressure gas from the wellhead to a high-pressure pipeline. The wellhead gas pressure, below atmospheric pressure or at a relatively low positive pressure, will require a vacuum pump or a low-pressure compressor to extract the gas and to boost it to 15 to 30 PSI above atmospheric pressure. A liquid ring vacuum pump or compressor is used as the first stage and then delivers the gas to the second stage high-pressure compressor. The high-pressure compressor, usually a rotary screw or reciprocating compressor, delivers the gas to a gas processing plant via a pipeline. "
- Forums
- ASX - By Stock
- Ann: BBB 33 Drilling Completed and Rig Mobilised to Bolling 4
is this what they are trying to solve? "Field gas boosting is...
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BNL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
-0.001(12.5%) |
Mkt cap ! $13.59M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.7¢ | $19.10K | 2.644M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 217810 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 9452045 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 217810 | 0.007 |
23 | 9787499 | 0.006 |
29 | 9733450 | 0.005 |
9 | 5566966 | 0.004 |
5 | 5523334 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 9452045 | 15 |
0.009 | 4564870 | 9 |
0.010 | 4041307 | 7 |
0.011 | 2364091 | 4 |
0.012 | 725000 | 1 |
Last trade - 15.59pm 29/04/2024 (20 minute delay) ? |
|
|||||
Last
0.7¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.7¢ | 0.7¢ | 0.7¢ | 658774 | ||
Last updated 15.28pm 29/04/2024 ? |
Featured News
BNL (ASX) Chart |