Hard to say, their realised prices over the year have been exceptional. I still haven’t figured how they manage to pull it off at those high prices
so upside on spot is limited in my opinion
but having said that, the production downgrade should been priced in. That’s why the share price fell in the past. My fear is the decline is a lot worse than expected…..if they are again, revising downward
- Forums
- ASX - By Stock
- BPT
- Ann: Beach Energy Ltd FY21 Results Presentation
Ann: Beach Energy Ltd FY21 Results Presentation, page-36
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.27 |
Change
0.015(1.20%) |
Mkt cap ! $2.897B |
Open | High | Low | Value | Volume |
$1.29 | $1.30 | $1.26 | $9.725M | 7.622M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 135823 | $1.27 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.28 | 50000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 61857 | 1.270 |
6 | 21703 | 1.265 |
11 | 76040 | 1.260 |
7 | 56695 | 1.255 |
3 | 37681 | 1.250 |
Price($) | Vol. | No. |
---|---|---|
1.275 | 20000 | 1 |
1.280 | 77180 | 5 |
1.285 | 3256 | 1 |
1.290 | 43177 | 2 |
1.295 | 67681 | 4 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
BPT (ASX) Chart |