BPT 1.45% $1.75 beach energy limited

Ann: Beach Energy Ltd FY23 Full Year Results, page-6

  1. 2,851 Posts.
    lightbulb Created with Sketch. 1312
    It was plugged and abandoned on 7th June
    Trigg 1 will be plugged and abandoned and the pre-planned side-track, Trigg 2, a contingent appraisal well,
    will not be drilled. The rig will now move to the Trigg Northwest 1 well location. After Trigg Northwest 1,
    Tarantula Deep 1 and Beharra Spring Deep 2 will be drilled
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
(20min delay)
Last
$1.75
Change
0.025(1.45%)
Mkt cap ! $3.980B
Open High Low Value Volume
$1.73 $1.76 $1.71 $17.37M 9.995M

Buyers (Bids)

No. Vol. Price($)
4 61438 $1.74
 

Sellers (Offers)

Price($) Vol. No.
$1.75 77036 2
View Market Depth
Last trade - 16.10pm 14/05/2024 (20 minute delay) ?
Last
$1.74
  Change
0.025 ( 1.17 %)
Open High Low Volume
$1.73 $1.76 $1.71 3086357
Last updated 15.59pm 14/05/2024 ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.