BPT 0.89% $1.67 beach energy limited

Ann: Beach Energy Ltd FY23 Full Year Results, page-6

  1. 2,851 Posts.
    lightbulb Created with Sketch. 1312
    It was plugged and abandoned on 7th June
    Trigg 1 will be plugged and abandoned and the pre-planned side-track, Trigg 2, a contingent appraisal well,
    will not be drilled. The rig will now move to the Trigg Northwest 1 well location. After Trigg Northwest 1,
    Tarantula Deep 1 and Beharra Spring Deep 2 will be drilled
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
(20min delay)
Last
$1.67
Change
-0.015(0.89%)
Mkt cap ! $3.804B
Open High Low Value Volume
$1.67 $1.68 $1.64 $7.439M 4.472M

Buyers (Bids)

No. Vol. Price($)
88 156718 $1.67
 

Sellers (Offers)

Price($) Vol. No.
$1.67 101927 47
View Market Depth
Last trade - 15.56pm 30/05/2024 (20 minute delay) ?
Last
$1.67
  Change
-0.015 ( 1.02 %)
Open High Low Volume
$1.67 $1.67 $1.64 1102840
Last updated 15.59pm 30/05/2024 ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.