BCN 0.00% 2.5¢ beacon minerals limited

HIGHLIGHTS • Maiden mineral resource estimates have been...

  1. 5,616 Posts.
    lightbulb Created with Sketch. 2192
    HIGHLIGHTS
    • Maiden mineral resource estimates have been completed for the Lightning and Golden Slipper Deposits at the Mt Dimer Project
    • Drilling program (47 RC holes) recently completed at the Mt Dimer Project
    • Lightning Mineral Resource estimate - 128,000 tonnes at 4.8 g/t Au for 20,000 ounces at 0.5 g/t lower cut-off
    • Golden Slipper Resource estimate - 312,000 tonnes at 3.20 g/t Au for 32,000 ounces at 0.5 g/t lower cut-off

    Beacon Minerals Limited (ASX: BCN) (Beacon or the Company) is pleased to advise that a reverse circulation (RC) resource definition drill program has been conducted at Mt Dimer during the months of March and April 2024. The drilling program comprised 47 holes to test existing mineralised intercepts, as well as look for extensions along strike and down dip of the Lightning and Golden Slipper Deposits.

    The maiden mineral resource estimate have been completed on the Lightning and Golden Slipper Deposits, located within the Mt Dimer Project, with the following results.

    PROJECT CUT OFF INDICATED INFERRED TOTAL MATERIAL

    (g/t Au) (‘000t) (g/t Au) (‘000oz) (‘000t) (g/t Au) (‘000oz) (‘000t) (g/t Au) (‘000oz)
    MT DIMER LIGHTNING 0.5 81 5.1 14 47 4.1 6 128 4.8 20
    GOLDEN SLIPPER 0.5 133 3.7 16 179 2.8 16 312 3.2 3
    Last edited by 1for1: 07/06/24
 
watchlist Created with Sketch. Add BCN (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $97.67M
Open High Low Value Volume
2.6¢ 2.6¢ 2.5¢ $9.19K 359.4K

Buyers (Bids)

No. Vol. Price($)
10 2033604 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 175616 2
View Market Depth
Last trade - 16.10pm 20/06/2024 (20 minute delay) ?
BCN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.