DTR 0.00% 0.9¢ dateline resources limited

Well put Stevienix1. I'm frustrated with the lack of technical...

  1. 30 Posts.
    lightbulb Created with Sketch. 2
    Well put Stevienix1. I'm frustrated with the lack of technical informaton being supplied. The IE report on Colarado was about the transaction, there was no information of any subatance about the project. Given we have to assume the "world renowned" geologist on the board has visited the project and as he is a competent person I'd have liked to have seen a technical annoucement.

    By the way the Fiji project is low tonnage but modertate copper verging on high grade zinc. They quote an inferred resource of 4.5mt at 3.9%Zn, 1.2%Cu with gold and silver credits, within 100m of surface, and lots of exploration upside, with potentially a porphyry copper source identified nearby.

    Newcrest have slowed down a lot lately and shed a number of marginal projects, but they kept hold of Namosi, so they must see some future in Fiji.

    I'm simply frustrated by lack of information, but hanging here.
 
watchlist Created with Sketch. Add DTR (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $13.11M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $98 10.90K

Buyers (Bids)

No. Vol. Price($)
15 4725373 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 5300824 3
View Market Depth
Last trade - 10.02am 03/07/2024 (20 minute delay) ?
DTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.