TSO 11.1% 3.0¢ tesoro gold ltd

hey noob expect an average of 30-40m per shift from each rig...

  1. 100 Posts.
    lightbulb Created with Sketch. 16
    hey noob expect an average of 30-40m per shift from each rig every 12 hrs. a conservative figure would be 1 hole 380-450m per week off each rig. which includes rig setup and collaring each hole. I'd expect them to be all over site setup .. excavating drill sumps and drill pads before the rigs need to setup at each new location. so simply 4 holes per week without knowing ground conditions
    Last edited by mlenon92: 24/01/21
 
watchlist Created with Sketch. Add TSO (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
0.003(11.1%)
Mkt cap ! $36.88M
Open High Low Value Volume
2.8¢ 3.0¢ 2.7¢ $41.54K 1.504M

Buyers (Bids)

No. Vol. Price($)
1 100000 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 122372 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
TSO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.