hey noob expect an average of 30-40m per shift from each rig every 12 hrs. a conservative figure would be 1 hole 380-450m per week off each rig. which includes rig setup and collaring each hole. I'd expect them to be all over site setup .. excavating drill sumps and drill pads before the rigs need to setup at each new location. so simply 4 holes per week without knowing ground conditions
- Forums
- ASX - By Stock
- Ann: Becoming a substantial holder
hey noob expect an average of 30-40m per shift from each rig...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TSO (ASX) to my watchlist
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $42.38M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.8¢ | $5.273K | 187.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 214032 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 718147 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 214032 | 0.028 |
3 | 1134970 | 0.027 |
4 | 780652 | 0.026 |
2 | 520000 | 0.025 |
1 | 200000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 718147 | 3 |
0.030 | 141701 | 1 |
0.031 | 100000 | 1 |
0.032 | 315625 | 2 |
0.033 | 80000 | 1 |
Last trade - 15.27pm 30/07/2024 (20 minute delay) ? |
Featured News
TSO (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online