TSO 1.79% 2.8¢ tesoro gold ltd

Corgi, how did you come up with 300m per day?I posted this back...

  1. 675 Posts.
    lightbulb Created with Sketch. 127
    Corgi, how did you come up with 300m per day?

    I posted this back in November;

    ”announcement 4th November - 41 holes completed at El Zorro, for
    11,241m

    announcement 17th November - 44 holes completed at El Zorro, for 12,386m

    1,145m have been drilled in 13 days or 88m per day.

    the drill team must be commended. they have consistently drilled roughly 90/m per day since drilling started back in July on a 24/7 basis.

    I’ve checked this a few times between announcements and it’s always been around 90m per day.

    that being the case I’m expecting 180m per day with 4 rigs.
 
watchlist Created with Sketch. Add TSO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.