from the most bullish broker, MB,
Lower grade, higher costs: LOM AISC is estimated at A$1,079/oz, which is
higher than the ~A$900/oz LOM AISC we had modelled. This is largely due to
a lower-than-expected inventory grade of 6.4g/t that was outlined in BGL’s
study. Pre-production capital costs are estimated at A$269m in the study,
higher than the A$155m we estimated due to a bigger process facility. With
BGL maintaining its aggressive drill programs throughout development we now
include a A$100m capital raise to complete project funding
******AISC 20% higher than MB's estimate
******** could be capital raising soon
- Forums
- ASX - By Stock
- BGL
- Ann: Bellevue Gold Stage 1 Feasibility Study
Ann: Bellevue Gold Stage 1 Feasibility Study, page-81
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BGL (ASX) to my watchlist
|
|||||
Last
$1.79 |
Change
0.035(2.00%) |
Mkt cap ! $2.101B |
Open | High | Low | Value | Volume |
$1.77 | $1.81 | $1.76 | $36.27M | 20.25M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 93529 | $1.78 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.79 | 203430 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 7608 | 1.780 |
2 | 7169 | 1.775 |
1 | 6608 | 1.770 |
2 | 18608 | 1.765 |
1 | 6608 | 1.760 |
Price($) | Vol. | No. |
---|---|---|
1.795 | 6608 | 1 |
1.800 | 6608 | 1 |
1.805 | 6608 | 1 |
1.810 | 21776 | 3 |
1.815 | 18176 | 3 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
BGL (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online