It's better to have 100m at 1g, with open pit mining and the current gold price its a lot more profitable to go for the 100 @ 1.
Also having a 1m at 100g is way too hard to process, a lot of processing plants struggle to process gold over 5g and often have to dilute for it to be the case.
optimum processing plant grade is 3-4gs
- Forums
- ASX - By Stock
- Ann: Best Drilling Results to date at Kookynie Gold Project
It's better to have 100m at 1g, with open pit mining and...
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost