SGQ 6.25% 2.6¢ st george mining limited

Very inclined to agree with you Mulac, hole 128 may not be...

  1. 6,165 Posts.
    lightbulb Created with Sketch. 1210
    Very inclined to agree with you Mulac, hole 128 may not be living up to expectations.  The Nov 1 announcement stated the DHEM would be completed on this hole ( and previous holes)  next week,  so at the very latest this implies by around Nov 10,    so likely the drilling would have been completed a few days before that before DHEM commenced .  And based on previous drill announcements from which drilling rates are easily calculated,  it would likely have taken only around 5 -6 days to drill hole 128 ( which is up dip from 127, so a bit shallower).  Add on a couple of drilling days for storms, so in all likelihood 128 has been completed  and if there were strong visuals of massive sulphide we would have heard by now.  The sulphides we know are dipping south-west, hole 128 was south east ( collared) to test the up dip.    Looks like we have to follow the beast down-dip n the next round of drilling, if not underway already.   Topped up today at 16c  from weak hands.
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.002(6.25%)
Mkt cap ! $25.20M
Open High Low Value Volume
2.4¢ 2.6¢ 2.4¢ $50.84K 1.996M

Buyers (Bids)

No. Vol. Price($)
1 751317 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 6000 1
View Market Depth
Last trade - 15.44pm 28/06/2024 (20 minute delay) ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.