SGQ 3.70% 2.6¢ st george mining limited

Ann: Best Ever Intercept At Investigators, page-124

  1. 90 Posts.
    lightbulb Created with Sketch. 65
    Hi All,

    Share price drop was minimal compared to the rest of the market.

    As far as the timing goes they may have drill the last hole but to report on the DHEM’s they must move the rigs as they will interfere with the readings.

    So if management wanted to report on all of the above then,
    1. Time taken to drill the last hole with bad weather.
    2. Move the rig.
    3. DHEM test all holes that have just been drilled, allowing for bad weather.

    As you can see this would take a lot longer than drilling the previous hole.

    Good luck to all.
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
-0.001(3.70%)
Mkt cap ! $25.70M
Open High Low Value Volume
2.6¢ 2.6¢ 2.6¢ $18.64K 716.9K

Buyers (Bids)

No. Vol. Price($)
4 1127715 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 39000 1
View Market Depth
Last trade - 12.08pm 21/06/2024 (20 minute delay) ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.