BeeJaye,
This is why cross-sections are useful.
Just for example to show a point;
Figure 4 in the Oct 19th announcement shows about a 45 degree NW plunge on the cross-section (for MAD060 line - no section shown for MAD126).
A 5.25m intersection on a vertical drill hole on a 45 degree plunging orebody gives a true thickness of 3.6m.
Therefore in this example 5.25m is a 46%
overestimation of thickness compared to the true thickness. It is not a directors special, but it is also not close to true width.
So, in this example, I would use a x0.68 multiplier (when looking at total Ni% calculations).
Example only to show a point, not directly about MAD126.
- Forums
- ASX - By Stock
- SGQ
- Ann: Best Ever Intercept At Investigators
Ann: Best Ever Intercept At Investigators, page-53
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.71M |
Open | High | Low | Value | Volume |
2.5¢ | 2.5¢ | 2.5¢ | $1.765K | 70.59K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 282712 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 167447 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 282712 | 0.025 |
1 | 1500000 | 0.024 |
3 | 1996091 | 0.023 |
2 | 3487040 | 0.022 |
3 | 360000 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 167447 | 2 |
0.027 | 323400 | 3 |
0.028 | 509799 | 4 |
0.029 | 365701 | 2 |
0.030 | 402784 | 2 |
Last trade - 10.36am 26/06/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |