sorry why do you think BHP had a cash blow out on the
project?
BHP are apparently considering whether to proceed with the Jensen project . What do you mean by cash blow out? In the case of Kll it was a cash blow out because the project costed more than was originally estimated and Kll didn’t have enough cash to continue the project.
In the case of BHP are you assuming it’s a cash blow out? Maybe the project has turned out to be more expensive than planned but they are obviously not not of cash rather they maybe questioning whether it’s economically viable to proceed with the project.
Once Kll is in production when do you think they will
turn a profit? If the company can hit this the line on time and budget? Kll will earn its stripes when it turns a profit and has a healthy PE to show for it!
- Forums
- ASX - By Stock
- Ann: Beyondie SOP Project - Commissioning Update
sorry why do you think BHP had a cash blow out on the project?...
-
- There are more pages in this discussion • 227 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $174.4K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable