If all pre-concentrator ponds are full does that mean we aren't pumping at moment?
Probably an OK scenario in any case, process bottlenecked waiting on plant start up only, maybe give them some time to rectify any small issues with trench/bore network and pumping stations.
Have they said in any releases approx how much come from trench vs bore?
And they are still bore pumping with diesel at moment or has power been run from the gen plant now? I remember power cable had been pre-laid in a lot of pipe network but nothing in announcements regarding this yet.
- Forums
- ASX - By Stock
- Ann: Beyondie SOP Project - Operations Update
If all pre-concentrator ponds are full does that mean we aren't...
-
- There are more pages in this discussion • 299 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable