"How bad was the recovery in producing the 400T? Little points they don’t mention."
What were you expecting ?
IMHO 400 tonnes (2 days production if at name plate ) is hardly enough production or time to fine tune recoveries on a plant .
I was just surprised they at least got some production out , even if recoveries or concentration levels of K2So4 in final product are low then it is at least is a positive that the flow sheet works at some practical level .
There is also around another A10M to be spent on the plant going by the bar graph on page 23 of the 31/10/21 presentation
There was a good sign if you looked at the latest photos in that the banks were not eroding maybe because they kept the water level higher but I really do not know - just surprised they were not using a repose angle .
Still the jury is out on if this will be a white elephant or a profitable outfit even with K prices currently almost 100% higher than what they budgeted .
- Forums
- ASX - By Stock
- KLL
- Ann: BEYONDIE UPDATE - PROCESS DESIGN VALIDATED
Ann: BEYONDIE UPDATE - PROCESS DESIGN VALIDATED, page-54
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable