Hi bdigii,
I have, albeit with limited info.
Update 1 strike
Length 800m width 300m Greenvale
Update 2 strike
Length 900m width 200m Greenvale
Down hole true: 60m from surface to 24m overburden.
Lucknow strike
Length 300m width 200m
This is above what hase been JORCed. Will aim at more conclusive analysis upon more results and mapping and will be interested in your analysis of the resource area but agree ploting co-ordinates with what has been ANN can lead to variants.
Love your expression "only a few hectare".....3 pits as big as 12 acres each is a good start don't you think. Again look at the pit design from the base BFS, (site layouts for all 3 sites) then add the above.
In an engine room today. Ciao for now.
Cheers
- Forums
- ASX - By Stock
- AUZ
- Ann: BFS supports strong commercial case for developing Sconi
Ann: BFS supports strong commercial case for developing Sconi, page-848
-
- There are more pages in this discussion • 289 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.8¢ | 0.9¢ | 0.8¢ | $88.75K | 10.80M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 10015708 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 10015708 | 0.007 |
26 | 41959946 | 0.006 |
13 | 28266865 | 0.005 |
8 | 4754750 | 0.004 |
2 | 2400000 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 300000 | 1 |
0.009 | 2685864 | 10 |
0.010 | 2632764 | 21 |
0.011 | 3768820 | 11 |
0.012 | 3343622 | 5 |
Last trade - 15.55pm 13/09/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online