ME01 - You are right. The current nameplate on the mine is 57mt pa and DRR receives $1m per additional tonne. BHP have stated that they are increasing that to 145Mtp. So at full capacity, BHP will have paid us one-off payments amounting to $88m. (Say over the next 18-24mths).
I think it will be paid in line with ramp up but not 100%. Someone else may have better info.
We will then be eligble for the 1.232% of the Aus $ quarterly FOB revenue. I think the moisture loss at mine has been running at 6-7%. Even at normalised prices ($85/t USD) I get to 4/5% div yield per annum pre franking. Seems pretty solid.
- Forums
- ASX - By Stock
- DRR
- Ann: BHP Announces First Production at South Flank
Ann: BHP Announces First Production at South Flank, page-20
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DRR (ASX) to my watchlist
|
|||||
Last
$4.08 |
Change
-0.075(1.81%) |
Mkt cap ! $2.141B |
Open | High | Low | Value | Volume |
$4.17 | $4.18 | $3.99 | $16.81M | 4.132M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
59 | 12213 | $4.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.08 | 30772 | 32 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
42 | 9945 | 4.070 |
47 | 30776 | 4.060 |
23 | 24580 | 4.050 |
13 | 14914 | 4.040 |
11 | 13902 | 4.030 |
Price($) | Vol. | No. |
---|---|---|
4.080 | 19424 | 26 |
4.090 | 16789 | 19 |
4.100 | 14561 | 12 |
4.110 | 7576 | 8 |
4.120 | 7181 | 7 |
Last trade - 14.25pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
$4.06 |
  |
Change
-0.075 ( 2.36 %) |
|||
Open | High | Low | Volume | ||
$4.18 | $4.18 | $4.00 | 992184 | ||
Last updated 14.45pm 17/06/2024 ? |
Featured News
DRR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online