AI1 7.84% 5.5¢ adisyn ltd

My pin head cant figure out how they have built a facility,...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 308 Posts.
    lightbulb Created with Sketch. 75
    My pin head cant figure out how they have built a facility, that's now getting Tier 3 DESIGN accreditation?

    So the DESIGNS have been approved, hence the part at the bottom of the announcement:
    " The Tier III Design Accreditation for Bibra Lake has a 2-year window to expiry, within which time DC Two
    has the opportunity to move towards achieving Tier III Construction Accreditation. In essence, this would
    mean Bibra Lake has been designed to provide superior protection, and the physical construction of the
    facility ensured the plans became a reality."

    So the actual Bibra Lake facility that has been constructed hasn't been accredited, but the design has? So where does that leave DC2, can they market as Tier 3 accredited when its only the design not the actual building that's been accredited.

    Only seeking clarity here as it doesn't make sense to me. In no way is this meant to be negative, purely seeking information. Not advice, just questions.

    Goodluck
 
watchlist Created with Sketch. Add AI1 (ASX) to my watchlist
(20min delay)
Last
5.5¢
Change
0.004(7.84%)
Mkt cap ! $16.62M
Open High Low Value Volume
5.2¢ 6.1¢ 5.1¢ $188.5K 3.323M

Buyers (Bids)

No. Vol. Price($)
1 99999 5.5¢
 

Sellers (Offers)

Price($) Vol. No.
5.8¢ 143746 1
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
AI1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.