Great announcement with more to come in the next few weeks as per announcement:
Ongoing Activities
Musgrave 100% tenements
•One-metre resamples from six-metre composites samples of approximately 40 regional aircore drill holes from Big Sky and Target 14 are expected in June.
•Further RC drilling at the White Heat and Numbers prospects is continuing with assays results expected late May.
•Follow-up RC drilling to define the basement source of gold anomalism at the new Big Sky target has commenced with 26 holes completed to date. First assay results are expected early June.
•Follow-up RC drilling to define the basement source of gold anomalism at Target 14 has also commenced with first assays results expected in June.
•Works to progress the prefeasibility study at Break of Day and Lena are continuing with additional diamond drilling for metallurgical testing underway.
Evolution JV
•The seven-hole, diamond drilling program to follow-up the extensive regolith gold anomalies identified in the regional aircore drilling program on Lake Austin has now been completed with assay results expected in June.
- Forums
- ASX - By Stock
- MGV
- Ann: Big Sky gold mineralisation strike length more than doubled
Ann: Big Sky gold mineralisation strike length more than doubled, page-2
-
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, CEO
Paul Long
CEO
Previous Video
Next Video
SPONSORED BY The Market Online