Bibblewindi 27 is the first vertical production well as part of two lateral “shield” wells to be
drilled, one either side of the current Bibblewindi Lateral Pilot. The strong performance of this
pilot to date has shown that it is drawing from a very large reservoir. To better represent the
development performance of this pilot and to reduce the water influx from the larger than
anticipated reservoir, the two shield wells will be drilled to allow the existing pilot to more
effectively draw down the reservoir pressure within the coals in a timely manner. Each is designed
as a single lateral drilled for approximately 1000m of in seam before intersecting a single vertical
producer.
The technical know how of this company is mind blowing in what they are achieving, I'm only seeing good news in this report.
- Forums
- ASX - By Stock
- ESG
- Ann: Bimonthly Drilling Report
Ann: Bimonthly Drilling Report , page-20
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)