This announcement is nothing but great The Luapula Processing Facility was constructed in 2014 at a reported cost of US$80m
Independent review included a detailed capital, working capital and operating cost analyses
and scheduling, that has demonstrated that an US$0.5m upgrade of the crushing and leaching
circuit is required. This work is to be completed over a 4-6 month period
4 to 6 Months we could be producing Cobalt , I guess thats pretty common on the ASX spec end hey