AUZ 6.25% 0.8¢ australian mines limited

Ann: Binding offtake agreement signed with LG Energy Solution, page-292

  1. 693 Posts.
    lightbulb Created with Sketch. 130
    yes, they are 'going back to the drawing board' so to speak, it appears the electric battery is shifting towards a preferred intermediate product of MHP rather than MSP.

    this new direction is actually a more simpler flowsheet, to produce precursors and cathode active materials (PCAM/CAM) directly, bypassing NiSO4 and CoSO4 production, decreasing costs. (its funny how your preferred peer, has flagged this shift as well, yet you don't see this as a negative for them?, were the pilot runs a waste for ARL to produce sulfate trials?)

    PCAM, is still very much in the picture in my opinion, LG must be driving the new modification of the pilot plant, lets wait for the new samples due soon and the subsequent pfs figures.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
-0.001(6.25%)
Mkt cap ! $10.48M
Open High Low Value Volume
0.7¢ 0.8¢ 0.7¢ $4.067K 567.1K

Buyers (Bids)

No. Vol. Price($)
39 22426576 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 1913482 13
View Market Depth
Last trade - 10.16am 06/08/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.