I had a quick look tonight at the original JORC drilling hole locations, and then against the coordinates of the new ‘infill’ holes which were recently completed.
I think we will get a positive updated JORC resource, an upgrade you could say... why?
Check drill holes 68/69 from the original JORC;
68 was 3.85m @ 27.78% (371,158)
69 was 1.70m @ 19.11% (371,149)
Now recently we drilled hole 164 (371,163) on the same 6,468,690 northerly line;
Hole 164 was drilled 5m from 68, and returned about 1.00m @ 15% average (was 2 thin seams) Confirming another 5m, albeit a bit thinner...
From what I can see we will be adding to our JORC because we’ve now stepped out the drilling with success. Though i would need to look grid line by grid line to compare... and see if our step out drilling was successful in intercepting the ceasium.
PIO Price at posting:
2.3¢ Sentiment: Buy Disclosure: Held
HotCopper & The Market Online will be live From the Floor at the Mining News Select Conference and we want to bring the voice of our online audience to the show with us.