I had a quick look tonight at the original JORC drilling hole locations, and then against the coordinates of the new ‘infill’ holes which were recently completed.
I think we will get a positive updated JORC resource, an upgrade you could say... why?
Check drill holes 68/69 from the original JORC;
68 was 3.85m @ 27.78% (371,158)
69 was 1.70m @ 19.11% (371,149)
Now recently we drilled hole 164 (371,163) on the same 6,468,690 northerly line;
Hole 164 was drilled 5m from 68, and returned about 1.00m @ 15% average (was 2 thin seams) Confirming another 5m, albeit a bit thinner...
From what I can see we will be adding to our JORC because we’ve now stepped out the drilling with success. Though i would need to look grid line by grid line to compare... and see if our step out drilling was successful in intercepting the ceasium.
PIO Price at posting:
2.3¢ Sentiment: Buy Disclosure: Held