This page has a lot of details:
https://www.mining-technology.com/projects/lorena-gold-project-queensland/#:~:text=Mining%20works%20commenced%20in%20October,the%20end%20of%20March%202018.
The brief history, as I understand it:
- Plant built in 2017, owned by Volga Elderberry
- Malachite Resources were in a JV to process ore there
- Ore processing was successful, but "the head grade, metallurgical recoveries and plant usage all lower than forecast"
- Malachite entered a dispute with Volga, dispute was settled in 2020
- Malachite went belly up
- Laneway Resources commenced processing of Agate Hill ore at Lorena in Q1 2021
- Crusher at Lorena broke down due to hardness of ore from Laneway, Laneway went elsewhere with 2200t of stockpile still requiring processing
- Laneway still operating, Lorena plant sitting idle
That's what I know, I'm certainly not an oracle on this, most of it is from research. As always DYOR and GLTAH
- Forums
- ASX - By Stock
- Ann: Binding Term Sheet Executed for Lorena Project Acquisition
This page has a lot of...
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBA (ASX) to my watchlist
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.12M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TBA (ASX) Chart |
Day chart unavailable