The Johnny Lee deposit has a Measured and Indicated Mineral Resource of 10.9 million tonnes (Mt) at an average copper grade of 2.9% for 311 thousand tonnes (kt) of contained copper (Cu) at a 1.0% Cu cut-off grade, and an Inferred Mineral Resource of 2.7 Mt at an average copper grade of 3.0% for 80 kt of contained Cu at a 1.0% Cu cut-off grade
The Lowry copper deposit is located approximately 2,500 meters east of the Johnny Lee deposit and has an Inferred Resource of 8.3 million tonnes of 2.4% copper
https://wp-sandfireamerica-2023.s3.ca-central-1.amazonaws.com/media/2022/09/SFR-Lowry-resource-drilling-2021-2022-8.16.22.pdf
_____________________
The Black Butte deposits are high grade, not large compared to Matsa and Motheo. Cu mining continues nearby at Continental.
It will be interesting to watch what SFR-USA does with it.
Ash
- Forums
- ASX - By Stock
- Ann: Black Butte Copper Project Legal Challenge Update
The Johnny Lee deposit has a Measured and Indicated Mineral...
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$10.65 |
Change
0.090(0.85%) |
Mkt cap ! $4.881B |
Open | High | Low | Value | Volume |
$10.90 | $10.92 | $10.57 | $9.258M | 861.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 2011 | $10.64 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$10.65 | 588 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1189 | 10.640 |
12 | 2289 | 10.630 |
19 | 5438 | 10.620 |
17 | 4373 | 10.610 |
13 | 7239 | 10.600 |
Price($) | Vol. | No. |
---|---|---|
10.650 | 616 | 5 |
10.660 | 1996 | 6 |
10.670 | 4164 | 8 |
10.680 | 5398 | 7 |
10.690 | 7856 | 8 |
Last trade - 14.54pm 08/11/2024 (20 minute delay) ? |
Featured News
SFR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online