BKT 1.89% 5.2¢ black rock mining limited

Ann: Black Rock Signs Conditional Framework Agreement with Urbix, page-27

  1. 9,063 Posts.
    lightbulb Created with Sketch. 3954
    This will change slightly given bringing forward of module 2. Means we start at 2Mtpa, I assume move to 3Mt and then 4 within the first say 3 years. So you essentially have 2 + 2 + 3 + 4×23 =99Mt processed in a 26 yr LOM.

    Current M+I stands at 116Mt. So assuming 90% mineable which it should be in those categories that covers the whole LOM. There is another 97Mt of Inferred. If assume 50% conversion of this then that adds another 12 years of LOM at 4Mtpa. Note production from a theoretical year 27-38 adds SFA to an NPV calc.

    Then as @scombley pointed out there is a heap of further exploration potential on their tenements.

    All said and done it might be a 50 year operation. Huge in the context of fact its trading a couple times initial stage 1+2 cashflow.
 
watchlist Created with Sketch. Add BKT (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
-0.001(1.89%)
Mkt cap ! $65.10M
Open High Low Value Volume
5.4¢ 5.4¢ 5.2¢ $51.95K 983.4K

Buyers (Bids)

No. Vol. Price($)
2 194994 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 75000 1
View Market Depth
Last trade - 16.10pm 27/09/2024 (20 minute delay) ?
BKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.