BKT 0.00% 5.3¢ black rock mining limited

This will change slightly given bringing forward of module 2....

  1. 9,046 Posts.
    lightbulb Created with Sketch. 3916
    This will change slightly given bringing forward of module 2. Means we start at 2Mtpa, I assume move to 3Mt and then 4 within the first say 3 years. So you essentially have 2 + 2 + 3 + 4×23 =99Mt processed in a 26 yr LOM.

    Current M+I stands at 116Mt. So assuming 90% mineable which it should be in those categories that covers the whole LOM. There is another 97Mt of Inferred. If assume 50% conversion of this then that adds another 12 years of LOM at 4Mtpa. Note production from a theoretical year 27-38 adds SFA to an NPV calc.

    Then as @scombley pointed out there is a heap of further exploration potential on their tenements.

    All said and done it might be a 50 year operation. Huge in the context of fact its trading a couple times initial stage 1+2 cashflow.
 
watchlist Created with Sketch. Add BKT (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.000(0.00%)
Mkt cap ! $66.35M
Open High Low Value Volume
5.5¢ 5.5¢ 5.3¢ $16.60K 306.3K

Buyers (Bids)

No. Vol. Price($)
1 38179 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 43860 1
View Market Depth
Last trade - 15.33pm 16/08/2024 (20 minute delay) ?
BKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.