Any company pushing construction and commissioning before product qualification is a massive risk and binding offtakes are not likely to be imminent. Qualification is required for the bulk of end user application with consistency and quality being key. If qualification hasn't taken place prior to commissioning, there will be a number of conditions and clauses present in any offtake agreements that are not easy to meet and make those contracts basically worthless.
BKT already has a credible offtake partner in POSCO.
- Forums
- ASX - By Stock
- Ann: Black Rock Signs MOU for Rail Transport from Mahenge
Any company pushing construction and commissioning before...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add BKT (ASX) to my watchlist
|
|||||
Last
6.1¢ |
Change
0.001(1.67%) |
Mkt cap ! $76.36M |
Open | High | Low | Value | Volume |
6.0¢ | 6.2¢ | 5.9¢ | $62.11K | 1.024M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 181938 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 135654 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 181938 | 0.061 |
1 | 24701 | 0.059 |
1 | 15000 | 0.056 |
4 | 140225 | 0.055 |
1 | 18500 | 0.054 |
Price($) | Vol. | No. |
---|---|---|
0.063 | 135654 | 1 |
0.064 | 500000 | 1 |
0.065 | 143970 | 3 |
0.066 | 440492 | 3 |
0.071 | 10000 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
BKT (ASX) Chart |