POS 0.00% 0.4¢ poseidon nickel limited

Ann: Black Swan Engineering - Key Outcomes, page-25

  1. 153 Posts.
    lightbulb Created with Sketch. 2
    Wilef / Collyn

    Mt Keith ore body is 0.6% Nickel. They produce a concentrate closer to 15% nickel on site which is sent to the drier at Leinster. This combined concentrate is then sent by road to Leonora where it is then conveyed into silos. This concentrate is then sent from Leonora to Kalgoorlie smelter by rail.

    regards

    Stevo_61
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $16.72M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $9.399K 2.388M

Buyers (Bids)

No. Vol. Price($)
108 62380125 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 51637167 37
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.