You can not compare this to Mt Keith, they knew it was big when they started ther and mined accordingly. However, I am sure POS will do what is required, I just do not believe the pits at BS can sustain big trucks.
Previously, the pit was operated with leased the equipment and it was returned when the mine shut. However, there is no shortage of gear around at the moment. It is available and cheep.
- Forums
- ASX - By Stock
- POS
- Ann: Black Swan Engineering - Key Outcomes
Ann: Black Swan Engineering - Key Outcomes, page-46
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $11.14M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $9.397K | 2.657M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
61 | 45048320 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 6330525 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
58 | 41667643 | 0.003 |
29 | 49305888 | 0.002 |
10 | 62798697 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 5814225 | 20 |
0.005 | 9351063 | 18 |
0.006 | 8769028 | 12 |
0.007 | 26022016 | 11 |
0.008 | 5500000 | 2 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |