BSX 7.89% 3.5¢ blackstone minerals limited

Ann: Blackstone Completes PFS at Ta Khoa Nickel Project, page-43

  1. 272 Posts.
    lightbulb Created with Sketch. 78
    yep ore grade being low has determined the 8mtpa scale, leading to the 1 year longer indicative construction timeline and the sell off from the high at 80cents. Looking through that, the opportunity is still A$3-5bn future market cap for $150m.
 
watchlist Created with Sketch. Add BSX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.