This is hard. In general I agree. They are running a very aggressive timeline. Less than 3 years from taking over project to production is essentially their goal. And in my opinion (certainly not fact) they are doing so to meet demand needs of EcoPro.
If EcoPro/maybe South Korean export credit are willing to stump up most of the capex costs to get this done then BSX might not have to get the studies done to the absolute best level in terms of future potential. Just show viability which should improve with each iteration into PFS and DFS as we have plenty of drilling left to go and they will be about more than tightening up confidence intervals.
I watched a conference recently where Ian Murray was presenting - he essentially said (paraphrasing) the only real point of a SS is to ensure there are no fatal flaws in a project. BSX SS did that for mine
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone Completes Scoping Study at Ta Khoa Nickel Project
Ann: Blackstone Completes Scoping Study at Ta Khoa Nickel Project, page-115
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.001(3.70%) |
Mkt cap ! $14.86M |
Open | High | Low | Value | Volume |
2.9¢ | 3.0¢ | 2.7¢ | $10.32K | 355.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 134943 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 125697 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134943 | 0.028 |
4 | 365383 | 0.027 |
2 | 345578 | 0.026 |
6 | 222000 | 0.025 |
1 | 70000 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 85697 | 3 |
0.031 | 56013 | 1 |
0.033 | 209309 | 1 |
0.040 | 19998 | 1 |
0.041 | 6233 | 1 |
Last trade - 15.59pm 08/11/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online