Moving from 450ktpa to 2mtpa requires alot more than a second mill, need more banks of float cells, extra holding tanks, bigger rom pad, extra ore crushing capacity, tailings had an extra lift under AMR, but going through 5X more throughput may need to get extra lift now to get it out of the way.
$10m-20m wont go far, before even looking at down stream. We are talking about a significant plant upgrade to get 5 times throughput of current setup.
My guesstimate for downstream alone is $20-35m, factoring in cheaper labour and parts than Oz.
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone Intersects 9m wide Nickel Sulfides at Ban Chang
Ann: Blackstone Intersects 9m wide Nickel Sulfides at Ban Chang, page-12
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
-0.002(5.00%) |
Mkt cap ! $20.06M |
Open | High | Low | Value | Volume |
3.9¢ | 3.9¢ | 3.6¢ | $14.78K | 394.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 25171 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 56568 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 11171 | 0.036 |
1 | 160000 | 0.035 |
1 | 200000 | 0.034 |
3 | 421666 | 0.030 |
1 | 24000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 56568 | 1 |
0.039 | 112470 | 1 |
0.040 | 89468 | 4 |
0.043 | 69700 | 1 |
0.044 | 24584 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |