BSX 4.55% 4.2¢ blackstone minerals limited

Not sure about the concentrator, mining is scheduled for 2023...

  1. 262 Posts.
    lightbulb Created with Sketch. 49
    Not sure about the concentrator, mining is scheduled for 2023 but they should be testing our dirt in 2022, I dont know a lot about the process but I think we wont be making any cashflow (nothing material at least) until the downstream unit is running in 2024. The downstream unit uses well known technology but theres always technical and execution risk so offtakes and partnerships are basically certain.
    A deal will probably involve forfeiting up to half of the ownership for the downstream subsidiary which is a shame but thats the reality, I have a feeling it will be similar to what FFX did with Ganfeng for their lithium deposit (mix of debt and equity funding for 50% equity), but with Ecopro most likely
 
watchlist Created with Sketch. Add BSX (ASX) to my watchlist
(20min delay)
Last
4.2¢
Change
-0.002(4.55%)
Mkt cap ! $22.06M
Open High Low Value Volume
4.4¢ 4.4¢ 4.1¢ $24.66K 581.9K

Buyers (Bids)

No. Vol. Price($)
1 17028 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 161369 5
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
BSX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.