They are also waiting on a mining permit, I believe that was mentioned in previous video interview. And that was expected to be granted in end of 2020/start 2021.
Which being honest I thought was unusual because, other indications where it is very easy to get drilling permits. but perhaps there is more to consider - Tailings dam is a big issue these days especially over last few years there have been a few catastrophes see Vale & BHP brasil (I think)
Another item is there is talks of expansion of the existing onsite concentrator to increase production capacity- to add extra ball/sag mill and more float cells.
On top of that I think this is not going to get rushed now, the PGE have introduced extra consideration.
The process flowsheet may need to be altered if their hoping to extract these for economic value if the numbers stack up, hence more Metallurgical benchwork. May need to be adding a separation circuit into the processing plant (gravity/magnetic regrind type isa mill, scavenger float cells, reagent testing for flotation of PGE)
Sounds to me like they are working up to a DFS and lining all the ducks up.
When they say 'Decision to Mine', It could actually mean the Decision to Mine based on permit application granted. Not company is going to decide to mine.
- Forums
- ASX - By Stock
- Ann: Blackstone Virtual Conference Presentation - May 2020
They are also waiting on a mining permit, I believe that was...
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
-0.002(5.00%) |
Mkt cap ! $20.06M |
Open | High | Low | Value | Volume |
3.9¢ | 3.9¢ | 3.6¢ | $14.78K | 394.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 25171 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 56568 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 11171 | 0.036 |
1 | 160000 | 0.035 |
1 | 200000 | 0.034 |
3 | 421666 | 0.030 |
1 | 24000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 56568 | 1 |
0.039 | 112470 | 1 |
0.040 | 89468 | 4 |
0.043 | 69700 | 1 |
0.044 | 24584 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |