Since I last posted I have done some more research and spoken with a number of people involved in the industry who are aware of this project. The conclusions I draw are as follows:
1. There is no agreement with Glencore to use the Blair Athol load out facility, nor will there ever be one.
2. TER's current plan B is to haul coal 110km to a TLO on another coal mine near Moranbah. This is the "nearby facility".
3. Increased costs associated with the above will make the Blair Athol mine a loss making venture until such time as a better TLO option is available (which I don't believe will be within 6 to 9 months).
4. TER have made a monumental stuff up with Blair Athol and are in damage control.
I am surprised at the scathing attacks on NQspirit on this thread. In my opinion he was spot on with his assessment and you should be thanking him.
I'm also surprised how not one single shareholder has demanded and received a response to the Glencore question, given its criticality to the viability of the project.
GLTAH
- Forums
- ASX - By Stock
- Ann: Blair Athol Update - Coal Production Commences
Since I last posted I have done some more research and spoken...
-
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TER (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
-0.005(2.94%) |
Mkt cap ! $132.1M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.5¢ | $229.3K | 1.378M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 606350 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 662521 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 606350 | 0.165 |
22 | 865347 | 0.160 |
10 | 1397336 | 0.155 |
20 | 554217 | 0.150 |
5 | 136150 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 662521 | 5 |
0.175 | 14633 | 3 |
0.180 | 975455 | 9 |
0.185 | 81176 | 3 |
0.190 | 349396 | 11 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
TER (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online