Not fit for purpose does not mean the product has failed. This sounds like a contractual failure. A mis understanding of what the product would do and not do. Sounds like some additional functionality is required which will be added to rectify to comply with contractual requirements.
not good news, but fixable. Need to be a lot more vigilant on the technical aspects contractually entered into.
At least the share price wont drop!!
- Forums
- ASX - By Stock
- ZMM
- Ann: Blaq Project Product Recall
Ann: Blaq Project Product Recall, page-22
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ZMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.002(18.2%) |
Mkt cap ! $4.890M |
Open | High | Low | Value | Volume |
1.1¢ | 1.3¢ | 1.1¢ | $17.50K | 1.481M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000000 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 749650 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000000 | 0.011 |
5 | 460460 | 0.010 |
3 | 214333 | 0.009 |
3 | 2120000 | 0.008 |
3 | 767857 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 749650 | 2 |
0.015 | 8103 | 1 |
0.020 | 18358 | 1 |
0.039 | 1281 | 1 |
0.045 | 200000 | 1 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
ZMM (ASX) Chart |