MAY melbana energy limited

Ann: Block 9 Alameda 2 Appraisal Update, page-398

  1. 3,480 Posts.
    lightbulb Created with Sketch. 497
    exactly ,the drill crew would have know this would not flow to surface hence the simulation test with water proved the reservoir had movable oil and pressure giving a estimate of 750bpd ,all it means is the pressure and weight of oil in the string out weighed the reservoir pressure ,as along as the drill hole fills with oil it will be pumped out , alot very rich companies around using donkey pumps ,
    unit 2 might be a ace yet
    https://hotcopper.com.au/data/attachments/5509/5509972-56cb4dd8b9142604b9817140009f41ba.jpg
    Schematic illustration of water injection in an oil reservoir. Cross section show the distribution of oil and water before and after the water has displaced the oil in porous matrix.
    Last edited by the flow: 15/08/23
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $39.98K 1.759M

Buyers (Bids)

No. Vol. Price($)
11 3120380 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 207741 5
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.